ITA

Activity

Risk factor analysis concerning the withdrawal or revocation of subsidized financial engineering and R&D investment projects during the period 2007-2013

Author: Vincenzo Lio, Patrizia Lattarulo

Delivery of the report "Risk factor analysis concerning the withdrawal or revocation of subsidized financial engineering and R&D investment projects during the period 2007-2013"

Date: 13-11-15

Commissioned by: Regione Toscana. Gestione Programma Operativo POR FSE

Downloadable material
pixel
Documento formato pdf Banca Dati